Change Currency: USD

Change Language: DeutschDanskEnglish (UK)English (US)Español

D122L dual battery harness with long leads

$16.00

Stock Level: 3

Product Information

D122 Dual Battery Harness with long leads for extended standby battery capacity.  Includes built in circuit breaker to protect against battery failure or incorrect connection. Leads for one battery are approximately 2 1/2 ft long, the second battery lead is about 3 ft long.  These are designed for mounting larger batteries in a secondary enclosure.  

NOS with 1 year warranty

Picture for illustration only, the one you will get has longer leads than the one in the pic.

Product Code: D122L

Customer Reviews

This product hasn't been reviewed yet. Write a review

 

eCommerce by CubeCart